KB Model Rigid Wheel Plate Type (With Stopper)

KB Model Rigid Wheel Plate Type (With Stopper)

A general purpose industrial caster used when transporting heavy items

PDF

Japanese Only

KB Model Lever Type Caster With Single Stopper, Outline Drawing And Dimensions

UWKB-100 (R) right stopper

UWKB-100 (R) right stopper

WKB-150 (L) left stopper

WKB-150 (L) left stopper

KB model lever type caster with single stopper, outline drawing

KB model lever type caster with single stopper, outline drawing

Part NumberWheelWheel DiameterWheel WidthMounting Height HMounting SeatMounting DimensionHole DiameterAllowable LoadDead Weight
D (mm)W (mm)H (mm)A × B (mm)X × Y (mm)P (mm)daN (kgf)(g)
WKB-100(R or L)Steel plate wheels, rubber (B included) tread10032144115 × 8080 × 4511120 (122.4)980
NRNylon wheel rubber tread (B included)100 (102.0)880
UWSteel plate wheels urethane (B included) tread180 (183.6)1,060
GUNylon wheel urethane tread (B included)100 (102.0)890
WKB-130(R or L)Steel plate wheels, rubber (B included) tread13040177137 × 93100 × 5611180 (183.6)1,660
NRNylon wheel rubber tread (B included)180 (183.6)1,260
UWSteel plate wheels urethane (B included) tread35250 (255.0)1,800
GUNylon wheel urethane tread (B included)40180 (183.6)1,515
WKB-150(R or L)Steel plate wheels, rubber (B included) tread15040198137 × 93100 × 5611200 (204.0)1,820
NRNylon wheel rubber tread (B included)200 (204.0)1,390
UWSteel plate wheels urethane (B included) tread38300 (306.0)2,090
GUNylon wheel urethane tread (B included)40200 (204.0)1,750
WKB-200(R or L)Steel plate wheels, rubber (B included) tread20043250151 × 102112 × 6311.5250 (255.0)3,260
UWSteel plate wheels urethane (B included) tread42400 (408.0)3,400
GUNylon wheel urethane tread (B included)43250 (255.0)2,710
  • *Fixtures: trivalent bright chromate finishing

Casters locking only wheel rotation.

Part Number
GUKB-100(L)
GUKB-100(R)
GUKB-130(L)
GUKB-130(R)
GUKB-150(L)
GUKB-150(R)
GUKB-200(L)
GUKB-200(R)
MCBKB-100(L)
MCBKB-100(R)
MCBKB-130(L)
MCBKB-130(R)
MCBKB-150(L)
MCBKB-150(R)
MCBKB-200(L)
MCBKB-200(R)
NRKB-100(L)
NRKB-100(L)-G
NRKB-100(R)
NRKB-100(R)-G
NRKB-130(L)
NRKB-130(R)
NRKB-150(L)
NRKB-150(L)-G
NRKB-150(R)
NRKB-150(R)-G
PHKB-100(L)
PHKB-100(R)
PHKB-130(L)
PHKB-130(R)
PHKB-150(L)
PHKB-150(R)
UWEKB-100(L)
UWEKB-100(R)
UWEKB-130(L)
UWEKB-130(R)
UWEKB-150(L)
UWEKB-150(R)
UWEKB-200(L)
UWEKB-200(R)
UWKB-100(L)
UWKB-100(R)
UWKB-130(L)
UWKB-130(R)
UWKB-150(L)
UWKB-150(R)
UWKB-200(L)
UWKB-200(R)
WEKB-100(L)
WEKB-100(R)
WEKB-130(L)
WEKB-130(R)
WEKB-150(L)
WEKB-150(R)
WEKB-200(L)
WEKB-200(R)
WKB-100(L)
WKB-100(L)-G
WKB-100(R)
WKB-100(R)-G
Part NumberVolume DiscountDays to ShipMounting Height H
(mm)
Properties Load Range
(daN)
Allowable Load
(daN)
Wheel Material Wheel Characteristics Mounting Hole Type Mounting Hole Pitch, Long Length Direction L1
(mm)
Mounting Hole Pitch, Short Length Direction W1
(mm)
Plate Length
(mm)
Plate Width
(mm)
Wheel Dia. D
(Ø)
Wheel Width
(mm)
Application Load Category Stopper Wheel Bearings Stopper Lever Type
4 Day(s) or more 144-80.01~140.00100[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Left)
4 Day(s) or more 144-80.01~140.00100[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Right)
4 Day(s) or more 177-140.01~220.00180[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379313040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Left)
4 Day(s) or more 177-140.01~220.00180[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379313040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Right)
4 Day(s) or more 198-140.01~220.00200[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379315040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Left)
4 Day(s) or more 198-140.01~220.00200[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379315040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Right)
4 Day(s) or more 250-220.01~320.00250[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole1126315110220043Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Left)
4 Day(s) or more 250-220.01~320.00250[Others] Nylon Foil Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole1126315110220043Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Right)
11 Day(s) or more --80.01~140.00100[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (left)
11 Day(s) or more --80.01~140.00100[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (right)
11 Day(s) or more --140.01~220.00180[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (left)
11 Day(s) or more --140.01~220.00180[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (right)
11 Day(s) or more --140.01~220.00200[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (left)
11 Day(s) or more --140.01~220.00200[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (right)
11 Day(s) or more --220.01~320.00250[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--151--43Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (left)
11 Day(s) or more --220.01~320.00250[Engineering Plastics] MC Nylon (Conductive)Abrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--151--43Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (right)
6 Day(s) or more 144-80.01~140.00100[Others] Nylon Foil RubberNoRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Left)
7 Day(s) or more --80.01~140.00120RubberNoRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (left)
6 Day(s) or more 144-80.01~140.00100[Others] Nylon Foil RubberNoRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Right)
7 Day(s) or more --80.01~140.00120RubberNoRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (right)
6 Day(s) or more 177-140.01~220.00180[Others] Nylon Foil RubberNoRound hole100561379313040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Left)
6 Day(s) or more 177-140.01~220.00180[Others] Nylon Foil RubberNoRound hole100561379313040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Right)
6 Day(s) or more 198-140.01~220.00200[Others] Nylon Foil RubberNoRound hole100561379315040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Left)
7 Day(s) or more --140.01~220.00200RubberNoSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (left)
6 Day(s) or more 198-140.01~220.00200[Others] Nylon Foil RubberNoRound hole100561379315040Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Right)
7 Day(s) or more --140.01~220.00200RubberNoSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesYesSingle stopper attached (right)
7 Day(s) or more --80.01~140.00100PhenolGasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more --80.01~140.00100PhenolGasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
7 Day(s) or more --140.01~220.00180PhenolGasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more --140.01~220.00180PhenolGasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceRound hole--137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
7 Day(s) or more --140.01~220.00200PhenolGasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more --140.01~220.00200PhenolGasoline Resistance (Light Oil included) / Oil Resistance / Chemical ResistanceSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
9 Day(s) or more -[Antistatic] Antistatic140.01~220.00180[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
9 Day(s) or more -[Antistatic] Antistatic140.01~220.00180[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
9 Day(s) or more -[Antistatic] Antistatic220.01~320.00250[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticRound hole--137--35Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
9 Day(s) or more -[Antistatic] Antistatic220.01~320.00250[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticRound hole--137--35Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
9 Day(s) or more -[Antistatic] Antistatic220.01~320.00300[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
9 Day(s) or more -[Antistatic] Antistatic220.01~320.00300[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
9 Day(s) or more -[Antistatic] Antistatic320.01~485.00400[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticRound hole--151---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
9 Day(s) or more -[Antistatic] Antistatic320.01~485.00400[Urethane] Aluminum Foil Thermosetting Urethane FoamAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil Resistance / AntistaticRound hole--151---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
2 Day(s) or more 144-140.01~220.00180[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Left)
2 Day(s) or more 144-140.01~220.00180[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Right)
2 Day(s) or more 177-220.01~320.00250[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379313035Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Left)
2 Day(s) or more 177-220.01~320.00250[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379313035Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Right)
2 Day(s) or more 198-220.01~320.00300[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379315038Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Left)
2 Day(s) or more 198-220.01~320.00300[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole100561379315038Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadPresencePresenceWith Single Stopper (Right)
4 Day(s) or more 250-320.01~485.00400[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole1126315110220042Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftExtra heavy loadPresencePresenceWith Single Stopper (Left)
4 Day(s) or more 250-320.01~485.00400[Urethane] UrethaneAbrasion Resistance / Gasoline Resistance (Light Oil included) / Oil ResistanceRound hole1126315110220042Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftExtra heavy loadPresencePresenceWith Single Stopper (Right)
7 Day(s) or more -[Antistatic] Electrical Conductivity80.01~140.00120RubberNoRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more -[Antistatic] Electrical Conductivity80.01~140.00120RubberNoRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
7 Day(s) or more -[Antistatic] Electrical Conductivity140.01~220.00180RubberNoRound hole--137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more -[Antistatic] Electrical Conductivity140.01~220.00180RubberNoRound hole--137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
7 Day(s) or more -[Antistatic] Electrical Conductivity140.01~220.00200RubberNoSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more -[Antistatic] Electrical Conductivity140.01~220.00200RubberNoSlotted Holes100 (112)50 (56)137---Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
7 Day(s) or more -[Antistatic] Electrical Conductivity220.01~320.00250RubberNoRound hole--151--43Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
7 Day(s) or more -[Antistatic] Electrical Conductivity220.01~320.00250RubberNoRound hole--151--43Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)
2 Day(s) or more 144-80.01~140.00100RubberNoRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Left)
7 Day(s) or more --80.01~140.00120RubberNoRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (left)
2 Day(s) or more 144-80.01~140.00100RubberNoRound hole80451158010032Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftMedium LoadPresencePresenceWith Single Stopper (Right)
7 Day(s) or more --80.01~140.00120RubberNoRound hole--11580--Streamlining of Logistics, Hand Truck / Factory facilities / Vertical liftHeavy LoadYesNoneSingle stopper attached (right)

Loading...

Basic Information

Caster Type Plate Type Fixed Stopper (Detail) With Rotation Stopper Fitting Material Steel

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7960 8499 / FAX:(60) 3 7960 7499
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)