(!)[Please update your OS version] Windows 7 users will be excluded from the recommended environment from 15 December 2019 onwards due to the end of support for Windows 7.

  • Due to Corona virus (2019-nCoV) outbreak, some suppliers must stop operation to follow additional precautionary measures until further notice. Some products delivery may be delay. Masks and other sanitary related products are suspended. Apologize for any inconvenience caused.

Pre-Sealed Core Fitting, Normal Type, for Connection of Lining Steel Pipes, Socket with Different Diameters

Part Number

Configured Part Number is shown.

 
Part Number
P-RS-20X15-CC
P-RS-25X15-CC
P-RS-25X20-CC
P-RS-32X20-CC
P-RS-32X25-CC
P-RS-40X15-CC
P-RS-40X20-CC
P-RS-40X25-CC
P-RS-40X32-CC
P-RS-50X20-CC
P-RS-50X25-CC
P-RS-50X32-CC
P-RS-50X40-CC
P-RS-65X20-CC
P-RS-65X25-CC
P-RS-65X32-CC
P-RS-65X40-CC
P-RS-65X50-CC
P-RS-80X20-CC
P-RS-80X25-CC
P-RS-80X32-CC
P-RS-80X40-CC
P-RS-80X50-CC
P-RS-80X65-CC
P-RS-100X20-CC
P-RS-100X25-CC
P-RS-100X32-CC
P-RS-100X40-CC
P-RS-100X50-CC
P-RS-100X65-CC
P-RS-100X80-CC
P-RS-125X100-CC
P-RS-150X100-CC
P-RS-150X125-CC
Part NumberVolume DiscountDays to ShipNominal of Thread M1 Nominal of Thread M2 Nominal of Thread 3(Different Diameters or Different Type Screw)
6 Day(s) or more 3/4B(20A)1/2B(15A)3/4B(20A)
6 Day(s) or more 1B(25A)1/2B(15A)-
6 Day(s) or more 1B(25A)3/4B(20A)-
6 Day(s) or more 1 1/4B(32A)3/4B(20A)-
6 Day(s) or more 1 1/4B(32A)1B(25A)-
6 Day(s) or more 1 1/2B(40A)1/2B(15A)-
6 Day(s) or more 1 1/2B(40A)3/4B(20A)-
6 Day(s) or more 1 1/2B(40A)1B(25A)-
6 Day(s) or more 1 1/2B(40A)1 1/4B(32A)-
6 Day(s) or more 2B(50A)3/4B(20A)-
6 Day(s) or more 2B(50A)1B(25A)-
6 Day(s) or more 2B(50A)1 1/4B(32A)-
6 Day(s) or more 2B(50A)1 1/2B(40A)-
6 Day(s) or more 2 1/2B(65A)3/4B(20A)-
6 Day(s) or more 2 1/2B(65A)1B(25A)-
6 Day(s) or more 2 1/2B(65A)1 1/4B(32A)-
6 Day(s) or more 2 1/2B(65A)1 1/2B(40A)-
6 Day(s) or more 2 1/2B(65A)2B(50A)-
6 Day(s) or more 3B(80A)3/4B(20A)-
6 Day(s) or more 3B(80A)1B(25A)-
6 Day(s) or more 3B(80A)1 1/4B(32A)-
6 Day(s) or more 3B(80A)1 1/2B(40A)-
6 Day(s) or more 3B(80A)2B(50A)-
6 Day(s) or more 3B(80A)2 1/2B(65A)-
6 Day(s) or more 4B(100A)3/4B(20A)-
6 Day(s) or more 4B(100A)1B(25A)-
6 Day(s) or more 4B(100A)1 1/4B(32A)-
6 Day(s) or more 4B(100A)1 1/2B(40A)-
6 Day(s) or more 4B(100A)2B(50A)-
6 Day(s) or more 4B(100A)2 1/2B(65A)-
6 Day(s) or more 4B(100A)3B(80A)-
6 Day(s) or more 5B(125A)4B(100A)-
6 Day(s) or more 6B(150A)4B(100A)-
6 Day(s) or more 6B(150A)5B(125A)-

Loading...

  1. 1

Basic Information

Type Fitting Connection Type Screw⇔Screw Different Diameter Connecting Shape Socket
Material Cast Iron Connection Thread Type M1 Rc Connection Thread Type M2 Rc
Max. Operating Pressure(MPa) 1 Applicable Fluid Water Surface Treatment Paint
Divisions of Max. Operating Pressure 1.0Mpa or Less Interior Resin Lining Presence (epoxy lining)

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7960 8499 / FAX:(60) 3 7960 7499
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)