Ck Fitting Threaded Transportable Cast Iron Pipe Fittings Plug

Part Number

Configured Part Number is shown.

 
Part Number
P-6-B
P-6-W
P-8-B
P-8-W
P-10-B
P-10-W
P-15-B
P-15-C
P-15-W
P-20-B
P-20-C
P-20-W
P-25-B
P-25-C
P-25-W
P-32-B
P-32-C
P-32-W
P-40-B
P-40-C
P-40-W
P-50-B
P-50-C
P-50-W
P-65-B
P-65-C
P-65-W
P-80-B
P-80-C
P-80-W
P-100-B
P-100-C
P-100-W
P-125-B
P-125-C
P-125-W
P-150-B
P-150-C
P-150-W
Part NumberVolume DiscountDays to ShipNominal of Thread M1 Applicable Fluid Surface Treatment
5 Day(s) or more 1/8B(6A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 1/8B(6A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 1/4B(8A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 1/4B(8A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 3/8B(10A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 3/8B(10A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 1/2B(15A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 1/2B(15A)WaterResin Coating
5 Day(s) or more 1/2B(15A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 3/4B(20A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 3/4B(20A)WaterResin Coating
5 Day(s) or more 3/4B(20A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 1B(25A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 1B(25A)WaterResin Coating
5 Day(s) or more 1B(25A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 1 1/4B(32A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 1 1/4B(32A)WaterResin Coating
5 Day(s) or more 1 1/4B(32A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 1 1/2B(40A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 1 1/2B(40A)WaterResin Coating
5 Day(s) or more 1 1/2B(40A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 2B(50A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 2B(50A)WaterResin Coating
5 Day(s) or more 2B(50A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 2 1/2B(65A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 2 1/2B(65A)WaterResin Coating
5 Day(s) or more 2 1/2B(65A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 3B(80A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 3B(80A)WaterResin Coating
5 Day(s) or more 3B(80A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 4B(100A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 4B(100A)WaterResin Coating
5 Day(s) or more 4B(100A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 5B(125A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 5B(125A)WaterResin Coating
5 Day(s) or more 5B(125A)Water / Air / Gas / OilZinc Plating
5 Day(s) or more 6B(150A)Water / Air / Steam / Gas / OilNo
5 Day(s) or more 6B(150A)WaterResin Coating
5 Day(s) or more 6B(150A)Water / Air / Gas / OilZinc Plating

Loading...

  1. 1

Basic Information

Type Fitting Connection Type Pitch (Terminal) Connecting Shape Plug
Material Cast Iron Connection Thread Type M1 R Max. Operating Pressure(MPa) 2.5
Divisions of Max. Operating Pressure than 2.0Mpa Interior Resin Lining No

Additional Products in this Category

Customers Who Viewed This Item Also Viewed

Tech Support

Factory Automation, Electronics, Tools, & MRO (Maintenance, Repair and Operations)
Tel:(60) 3 7960 8499 / FAX:(60) 3 7960 7499
9:00am - 6:00pm (Monday - Friday)
9:00am - 1:00pm (Saturday)